Scout Storage I
9 MW storage in Accomack, VA · In queue since January 2020 · Proposed COD April 2026
9 MW
Capacity
1
Components
Battery
6y 4m
In Queue
System Impact Study
IA Status
COD target: 2026
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-04-01
The proposed Scout Storage I project is a 9 MW battery storage development in Accomack County, Virginia. It is located within the PJM Interconnection region and is interconnected with Delmarva Power & Light (DPL) at the Wattsville 12 kV point of interconnection.
The project, identified as PJM-AF2-060 in the PJM queue, entered the queue on January 25, 2020, and has a proposed commercial operation date of April 1, 2026. Its interconnection status is currently in the System Impact Study phase, but is currently listed as suspended.
Generated from interconnection queue and public data sources
State
VA
County
Accomack
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
DPL
Entity
PJM
Service Type
—
Point of Interconnection
Wattsville 12 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WATTSVIL69 KV LOADT1
- POI Substation
- Wattsville Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Scout Storage I