PJM-AF2-069
9.3 MW generation in Bureau, IL · In queue since January 2020 · Proposed COD October 2021
9.3 MW
Capacity
1
Components
Wind
6y 4m
In Queue
System Impact Study
IA Status
COD target: 2021
Total Duration
1y 9m
Schedule
56 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2021-10-04
PJM-AF2-069 is a proposed wind generation project with a total capacity of 9.3 MW. The project is located in Bureau County, Illinois, within the ComEd service area and the PJM Interconnection region. The project consists of 9.3 MW of wind generation capacity.
The project entered the PJM interconnection queue on January 31, 2020, with a proposed commercial operation date of October 4, 2021. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is at the Crescent Ridge 138 kV line.
Generated from interconnection queue and public data sources
State
IL
County
Bureau
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Crescent Ridge 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.