PJM-AF2-081
80 MW generation in Currituck, NC · In queue since January 2020 · Proposed COD December 2023
80 MW
Capacity
1
Components
Solar
6y 4m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 11m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
PJM-AF2-081 is a proposed solar generation project with a total capacity of 80 MW, located in Currituck County, North Carolina. The project is being developed within the Dominion service area and is listed in the PJM interconnection queue as of January 31, 2020. The proposed commercial operation date is December 1, 2023.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Moyock 230 kV substation.
Generated from interconnection queue and public data sources
State
NC
County
Currituck
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Moyock 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- MOYOCK 34.5 KV RANCHLSP
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-081