PJM-AF2-111
250 MW generation in Mason, KY · In queue since February 2020 · Proposed COD December 2023
250 MW
Capacity
1
Components
Solar
6y 3m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 10m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AF2-111 is a proposed solar generation project with a total capacity of 250 MW, located in Mason County, Kentucky. The project is being developed within the PJM Interconnection queue, with an entry date of February 28, 2020. The proposed commercial operation date is December 31, 2023. The interconnection status is currently in the System Impact Study phase.
The project is interconnected to the grid at the North Clark-Spurlock 345 kV point of interconnection and is sponsored by EKPC.
Generated from interconnection queue and public data sources
State
KY
County
Mason
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
North Clark-Spurlock 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-111