Project PJM-AF2-142 — Project Summary

Queue ID
PJM-AF2-142
Capacity
150 MW
Technology
Solar
Status
active
Location
Lasalle, IL
Region
PJM
Developer
IA Status
System Impact Study

PJM-AF2-142

PJM-AF2-142BetaActiveSolarPJMLBNL

150 MW generation in Lasalle, IL · In queue since March 2020 · Proposed COD December 2023

150 MW

Capacity

1

Components

Solar

6y 2m

In Queue

System Impact Study

IA Status

COD target: 2023

Interconnection

Total Duration

3y 9m

Schedule

28 months past proposed COD

Impact Study25%
Queue EntryMar 12, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

About

PJM-AF2-142 is a proposed solar generation project with a total capacity of 150 MW, located in Lasalle County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 12, 2020. The proposed commercial operation date is December 31, 2023. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Nevada 345 kV substation.

The project is being developed within the ComEd utility territory. It consists of 150 MW of solar photovoltaic generation. The project is listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

IL

County

Lasalle

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ComEd

Entity

PJM

Service Type

Point of Interconnection

Nevada 345 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
N ILLINOIS HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
NEVADAOE138 KV TR3 LD
POI Substation
Nevada Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project PJM-AF2-142