PJM-AF2-142
150 MW generation in Lasalle, IL · In queue since March 2020 · Proposed COD December 2023
150 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AF2-142 is a proposed solar generation project with a total capacity of 150 MW, located in Lasalle County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 12, 2020. The proposed commercial operation date is December 31, 2023. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Nevada 345 kV substation.
The project is being developed within the ComEd utility territory. It consists of 150 MW of solar photovoltaic generation. The project is listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
IL
County
Lasalle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Nevada 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- NEVADAOE138 KV TR3 LD
- POI Substation
- Nevada Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.