PJM-AF2-143
150 MW generation in Lasalle, IL · In queue since March 2020 · Proposed COD December 2023
150 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AF2-143 is a proposed solar generation project with a total capacity of 150 MW. The project is located in Lasalle County, Illinois, within the ComEd service area and the PJM Interconnection region. The project entered the PJM queue on March 12, 2020, and has a proposed commercial operation date of December 31, 2023.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Powerton-Nevada 345 kV line.
Generated from interconnection queue and public data sources
State
IL
County
Lasalle
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Powerton-Nevada 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.