Blossom Solar (PJM-AF2-150) — Project Summary

Queue ID
PJM-AF2-150
Capacity
88 MW
Technology
Solar
Status
active
Location
Morrow, OH
Region
PJM
Developer
IA Status
IA Executed

Blossom Solar

PJM-AF2-150BetaActiveSolarPJMLBNL + Live

88 MW generation in Morrow, OH · In queue since March 2020 · Proposed COD July 2027

88 MW

Capacity

1

Components

Solar

6y 2m

In Queue

IA Executed

IA Status

COD target: 2027

Status
as of 6y 9m ago
Latest milestoneconstruction start · 2020Treasure Coast News · 2019-08-23
Expected CODQ1 2021Treasure Coast News · 2019-08-23
Interconnection

Total Duration

7y 4m

Construction75%
Queue EntryMar 13, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-07-31

About

Blossom Solar is a proposed 88 MW solar generation project located in Morrow County, Ohio. The project is in the PJM interconnection queue as entry PJM-AF2-150, with a queue entry date of March 13, 2020, and a proposed commercial operation date of July 31, 2027. The interconnection agreement (IA) for the project has been executed.

The Blossom Solar project is interconnected to the ATSI utility system at the Galion 138 kV point of interconnection. Recent news coverage has discussed the project's development, industry impact, and regulatory aspects.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Morrow

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Galion 138 kV

Data Source

LBNL + Live

DeveloperFlorida Power & Light Co.Treasure Coast News · 2019-08-23
ApplicantOpen Road RenewablesMorrow County Sentinel · 2023-05-31
AgencyOhio Power Siting BoardMorrow County Sentinel · 2023-05-31
RulingApprovalMorrow County Sentinel · 2023-05-31
Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GALION 34.5 KV BLOSSOSP
POI Substation
Galion Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

News & Articles (2)Beta

Last updated 2026-03-26