Lake Trout Solar
45 MW generation in Blackford, IN · In queue since March 2020 · Proposed COD January 2028
45 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
7y 10m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-01-31
Lake Trout Solar is a proposed 45 MW solar generation project located in Blackford County, Indiana. The project is in the PJM interconnection queue as entry PJM-AF2-162, with a queue entry date of March 16, 2020, and a proposed commercial operation date of January 31, 2028. The interconnecting utility is AEP.
The project's interconnection agreement has been executed.
Generated from interconnection queue and public data sources
State
IN
County
Blackford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Keystone-Desoto 345 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.