PJM-AF2-173
140 MW generation in Delaware, IN · In queue since March 2020 · Proposed COD October 2023
140 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 7m
Schedule
31 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-31
PJM-AF2-173 is a proposed solar generation project with a total capacity of 140 MW. The project is located in Delaware County, Indiana, within the PJM Interconnection region. The queue entry date is March 19, 2020, with a proposed commercial operation date of October 31, 2023.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Desoto 345 kV substation. The interconnecting utility is AEP.
Generated from interconnection queue and public data sources
State
IN
County
Delaware
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Desoto 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- POI Substation
- Desoto Substation