PJM-AF2-182
300 MW generation in Lee, IL · In queue since March 2020 · Proposed COD December 2022
300 MW
Capacity
1
Components
Solar
6y 2m
In Queue
Feasibility Study
IA Status
COD target: 2022
Total Duration
2y 9m
Schedule
42 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-01
PJM-AF2-182 is a proposed solar generation project with a total capacity of 300 MW, located in Lee County, Illinois. The project is interconnected within the PJM Interconnection queue, having entered the queue on March 21, 2020. The proposed commercial operation date is December 1, 2022.
The interconnection status for PJM-AF2-182 is currently in the Feasibility Study phase. The project is being developed within the ComEd utility territory and connects to the Nelson-Lee County 345 kV II point of interconnection.
Generated from interconnection queue and public data sources
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Nelson-Lee County 345 kV II
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.