Canal Road
120 MW generation in Wayne, OH · In queue since March 2020 · Proposed COD November 2028
120 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Status
COD target: 2028
Total Duration
8y 8m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2028-11-30
The Canal Road project is a proposed 120 MW solar generation project located in Wayne County, Ohio. The project is interconnected to the ATSI utility network within the PJM Interconnection region. It entered the PJM queue as project AF2-187 on March 22, 2020, and has a proposed commercial operation date of November 30, 2028. The project's interconnection agreement has been executed.
The Canal Road project has been mentioned in recent industry news.
Generated from interconnection queue and public data sources
State
OH
County
Wayne
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Brookside-Cloverdale 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Canal Road