Washington West Solar
40 MW hybrid in Snyder, PA · In queue since March 2020 · Proposed COD December 2026
40 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
6y 9m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 18–30 months
Proposed COD: 2026-12-30
The Washington West Solar project is a proposed 40 MW hybrid solar and battery energy storage project in Snyder County, Pennsylvania. The project, located within the PJM Interconnection region and connected to the PPL utility, consists of a 40 MW solar component.
The project is listed in the PJM interconnection queue as entry AF2-234, with a queue entry date of March 26, 2020, and a proposed commercial operation date of December 30, 2026. The project's interconnection agreement has been executed. The point of interconnection is the Sunbury Yard #1-Richfield Tie #2 69 kV line. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
PA
County
Snyder
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PPL
Entity
PJM
Service Type
—
Point of Interconnection
Sunbury Yard #1-Richfield Tie #2 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- SUNBURY 12 KV CT 1-2
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.