PJM-AF2-294
17 MW generation in Wayne, PA · In queue since March 2020 · Proposed COD March 2025
17 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
5 years
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-03-31
PJM-AF2-294 is a proposed solar generation project located in Wayne County, Pennsylvania, within the PJM Interconnection region. The project, with a total capacity of 17 MW, consists entirely of solar photovoltaic generation. Its interconnection request was entered into the PJM queue on March 29, 2020, with a proposed commercial operation date of March 31, 2025. The project's interconnection status is currently in the System Impact Study phase.
The proposed project is located within the PENELEC utility service territory. Its queue status is currently listed as suspended. The point of interconnection (POI) is the Thompson 34.5 kV substation.
Generated from interconnection queue and public data sources
State
PA
County
Wayne
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Thompson 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-294