Jarratt Energy Facility 2
18 MW generation in Greensville, VA · In queue since March 2020 · Proposed COD December 2022
18 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
2y 9m
Schedule
41 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-12-12
The Jarratt Energy Facility 2 is a proposed 18 MW solar generation project located in Greensville County, Virginia. The project is in the PJM interconnection queue as entry PJM-AF2-299, with a queue entry date of March 30, 2020. Dominion is the interconnecting utility.
The proposed commercial operation date for the Jarratt Energy Facility 2 is December 12, 2022. The project's interconnection status is currently in the System Impact Study phase.
Generated from interconnection queue and public data sources
State
VA
County
Greensville
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Fields 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Jarratt Energy Facility 2