89 MW hybrid in Surry, VA · In queue since March 2020 · Proposed COD September 2028
89 MW
Capacity
1
Components
Solar
6y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
8y 6m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
PJM-AF2-304 is a proposed 89 MW hybrid solar and battery project located in Surry County, Virginia. The project, which consists of 89 MW of solar generation, is in the PJM interconnection queue as of March 30, 2020, with a proposed commercial operation date of September 1, 2028. Dominion is the interconnecting utility.
The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Surry-Hopewell 230 kV line.
Generated from interconnection queue and public data sources
State
VA
County
Surry
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Surry-Hopewell 230 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.