PJM-AF2-307
64.2 MW generation in Bath, KY · In queue since March 2020 · Proposed COD September 2023
64.2 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 6m
Schedule
33 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-01
PJM-AF2-307 is a proposed solar generation project with a total capacity of 64.2 MW. The project is located in Bath County, Kentucky, and is being developed within the PJM Interconnection region. The project entered the PJM queue on March 30, 2020, with a proposed commercial operation date of September 1, 2023. The interconnecting utility is EKPC. Its interconnection status is currently in the System Impact Study phase.
The proposed project consists of 64.2 MW of solar photovoltaic generation. It is listed as an active project in the PJM interconnection queue. The point of interconnection is the Hope-Belvins Valley Tap 69 kV line.
Generated from interconnection queue and public data sources
State
KY
County
Bath
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Hope-Belvins Valley Tap 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- VALLEY4 230 KV SR_1
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-307