SBC Solar (PJM-AF2-325) — Project Summary

Queue ID
PJM-AF2-325
Capacity
10 MW
Technology
Solar+Battery
Status
active
Location
Dorchester, MD
Region
PJM
Developer
IA Status
System Impact Study

SBC Solar

PJM-AF2-325BetaActiveSolarBatteryPJMLBNL + Live

10 MW hybrid in Dorchester, MD · In queue since March 2020 · Proposed COD December 2027

10 MW

Capacity

1

Components

Solar

6y 2m

In Queue

System Impact Study

IA Status

COD target: 2027

Interconnection

Total Duration

7y 9m

Impact Study25%
Queue EntryMar 30, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The SBC Solar project is a proposed 10 MW hybrid solar and battery energy storage project located in Dorchester County, Maryland. The project, consisting of 10 MW of solar generation, is in the PJM interconnection queue as entry PJM-AF2-325. The queue entry date is March 30, 2020, and the proposed commercial operation date is December 31, 2027. The project's interconnection status is currently in the System Impact Study phase.

The proposed project is located within the Delmarva Power & Light (DPL) service area and interconnects at the Jacktown 12 kV point of interconnection. The project is listed as active within the PJM queue. The developer is not specified in the provided data.

Generated from interconnection queue and public data sources

Project Details

State

MD

County

Dorchester

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

DPL

Entity

PJM

Service Type

Point of Interconnection

Jacktown 12 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
CAMBRIDG69 KV CAMBRISP
POI Substation
Jacktown Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about SBC Solar