PJM-AF2-335
100 MW generation in Delaware, IN · In queue since March 2020 · Proposed COD December 2023
100 MW
Capacity
1
Components
Solar
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 9m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AF2-335 is a proposed solar generation project with a total capacity of 100 MW, located in Delaware County, Indiana. The project is in the PJM interconnection queue, having entered on March 31, 2020. The proposed commercial operation date is December 31, 2023. The interconnecting utility is AEP.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Delaware-Royerton 138 kV line.
Generated from interconnection queue and public data sources
State
IN
County
Delaware
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Delaware-Royerton 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-335