Walker Solar Two
80 MW generation in Juniata, PA · In queue since March 2020 · Proposed COD September 2026
80 MW
Capacity
1
Components
Solar
6y 2m
In Queue
IA Executed
IA Status
COD target: 2026
Total Duration
6y 6m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2026-09-19
Walker Solar Two is a proposed 80 MW solar generation project located in Juniata County, Pennsylvania. The project is in the PJM interconnection queue (queue ID PJM-AF2-361), having entered the queue on March 31, 2020. The proposed commercial operation date is September 19, 2026, and the interconnection agreement has been executed.
The project, which interconnects with PPL at the Mifflintown Tap 69 kV, has been featured in recent news coverage.
Generated from interconnection queue and public data sources
State
PA
County
Juniata
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PPL
Entity
PJM
Service Type
—
Point of Interconnection
Mifflintown Tap 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- POI Substation
- Mifflintown Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Walker Solar Two