RHC Solar (PJM-AF2-379) — Project Summary

Queue ID
PJM-AF2-379
Capacity
3.9 MW
Technology
Solar+Battery
Status
active
Location
Somerset, MD
Region
PJM
Developer
IA Status
System Impact Study

RHC Solar

PJM-AF2-379BetaActiveSolarBatteryPJMLBNL + Live

3.9 MW hybrid in Somerset, MD · In queue since April 2020 · Proposed COD December 2024

3.9 MW

Capacity

1

Components

Solar

6y 1m

In Queue

System Impact Study

IA Status

COD target: 2024

Interconnection

Total Duration

4y 8m

Schedule

17 months past proposed COD

Impact Study25%
Queue EntryApr 1, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-01

About

The RHC Solar project is a proposed 3.9 MW hybrid solar and battery energy storage project located in Somerset County, Maryland. The project consists of 3.9 MW of solar generation. It is interconnected to the Delmarva Power & Light (DPL) system at the Princess Anne 25 kV point of interconnection.

The project is listed in the PJM Interconnection queue as project number AF2-379, with an original queue entry date of April 1, 2020. The proposed commercial operation date is December 1, 2024. Its interconnection status is currently in the System Impact Study phase. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

MD

County

Somerset

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

DPL

Entity

PJM

Service Type

Point of Interconnection

Princess Anne 25 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
LANDSTWN230 KV SV1
POI Substation
Princess Anne Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.