PJM-AF2-382
75 MW generation in Buchanan, VA · In queue since March 2020 · Proposed COD September 2028
75 MW
Capacity
1
Components
Solar
6y 2m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
8y 6m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-30
PJM-AF2-382 is a proposed 75 MW solar generation project located in Buchanan County, Virginia. The project is in the PJM interconnection queue, having entered on March 31, 2020, with a proposed commercial operation date of September 30, 2028. The interconnecting utility is AEP. Its interconnection status is currently in the Facility Study phase.
The development project consists of 75 MW of solar photovoltaic generation. The point of interconnection is the Hurley 69 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Buchanan
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Hurley 69 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- POI Substation
- Hurley Avenue Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.