PJM-AF2-388
200 MW generation in Blackford, IN · In queue since March 2020 · Proposed COD December 2023
200 MW
Capacity
1
Components
Wind
6y 2m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 9m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-15
PJM-AF2-388 is a proposed 200 MW wind energy project located in Blackford County, Indiana. The project, which consists of 200 MW of wind generation, is in the PJM interconnection queue as of March 31, 2020. The proposed commercial operation date is December 15, 2023. The interconnecting utility is AEP.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Keystone-Desoto 345 kV line.
Generated from interconnection queue and public data sources
State
IN
County
Blackford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Keystone-Desoto 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.