PJM-AF2-392
199 MW generation in Lee, IL · In queue since March 2020 · Proposed COD September 2024
199 MW
Capacity
1
Components
Wind
6y 2m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
4y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
PJM-AF2-392 is a proposed 199 MW wind generation project located in Lee County, Illinois. The project is interconnected with ComEd and is in the PJM interconnection queue, with an entry date of March 31, 2020. Its proposed commercial operation date is September 1, 2024. The project's interconnection status is currently in the Feasibility Study phase.
The development project consists of 199 MW of wind capacity. The point of interconnection is the Nelson-Dixon 138 kV line. The project is currently listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
IL
County
Lee
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Nelson-Dixon 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AF2-392