Harvey Solar I
127.5 MW generation in Licking, OH · In queue since June 2020 · Proposed COD January 2029
127.5 MW
Capacity
1
Components
Solar
5y 11m
In Queue
Facility Study
IA Status
COD target: 2029
Total Duration
8y 7m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-01-15
Harvey Solar I is a proposed 127.5 MW solar generation project located in Licking County, Ohio. The project is being developed within the PJM Interconnection queue as project AG1-034. The queue entry date is June 12, 2020, with a proposed commercial operation date of January 15, 2029. The interconnection status is currently in the Facility Study phase.
The project is interconnected to the AEP utility grid at the Centerburg 138 kV point of interconnection. The project has appeared in recent news coverage regarding renewable energy development in Ohio.
Generated from interconnection queue and public data sources
State
OH
County
Licking
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Centerburg 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Harvey Solar I