Blossom Solar (PJM-AG1-039) — Project Summary

Queue ID
PJM-AG1-039
Capacity
56 MW
Technology
Solar
Status
active
Location
Morrow, OH
Region
PJM
Developer
IA Status
IA Executed

Blossom Solar

PJM-AG1-039BetaActiveSolarPJMLBNL + Live

56 MW generation in Morrow, OH · In queue since June 2020 · Proposed COD July 2027

56 MW

Capacity

1

Components

Solar

5y 11m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

7y 1m

Construction75%
Queue EntryJun 18, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-07-31

About

The Blossom Solar project is a proposed 56 MW solar generation project located in Morrow County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AG1-039, with a queue entry date of June 18, 2020. The proposed commercial operation date is July 31, 2027, and the project has an Interconnection Agreement (IA) executed.

The project, which is under development within the American Transmission Systems, Inc. (ATSI) utility territory, consists of 56 MW of solar photovoltaic generation. The point of interconnection (POI) is the Galion 138 kV II substation. The Blossom Solar project has appeared in recent news coverage regarding renewable energy development in Ohio.

Generated from interconnection queue and public data sources

Project Details

State

OH

County

Morrow

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

ATSI

Entity

PJM

Service Type

Point of Interconnection

Galion 138 kV II

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
GALION 34.5 KV BLOSSOSP
POI Substation
Galion Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Blossom Solar