Blossom Solar
56 MW generation in Morrow, OH · In queue since June 2020 · Proposed COD July 2027
56 MW
Capacity
1
Components
Solar
5y 11m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
7y 1m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-07-31
The Blossom Solar project is a proposed 56 MW solar generation project located in Morrow County, Ohio. The project is interconnected within the PJM Interconnection queue as entry PJM-AG1-039, with a queue entry date of June 18, 2020. The proposed commercial operation date is July 31, 2027, and the project has an Interconnection Agreement (IA) executed.
The project, which is under development within the American Transmission Systems, Inc. (ATSI) utility territory, consists of 56 MW of solar photovoltaic generation. The point of interconnection (POI) is the Galion 138 kV II substation. The Blossom Solar project has appeared in recent news coverage regarding renewable energy development in Ohio.
Generated from interconnection queue and public data sources
State
OH
County
Morrow
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ATSI
Entity
PJM
Service Type
—
Point of Interconnection
Galion 138 kV II
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- GALION 34.5 KV BLOSSOSP
- POI Substation
- Galion Substation