South Branch Solar
46 MW generation in Hancock, OH · In queue since July 2020 · Proposed COD December 2025
46 MW
Capacity
1
Components
Solar
5y 10m
In Queue
IA Executed
IA Status
COD target: 2025
Total Duration
5y 5m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Construction pending
Typical: 12–24 months
Proposed COD: 2025-12-31
South Branch Solar is a proposed 46 MW solar generation project located in Hancock County, Ohio. The project is in the PJM interconnection queue as entry AG1-076, with a queue entry date of July 31, 2020, and a proposed commercial operation date of December 31, 2025. The interconnecting utility is AEP.
The project's interconnection agreement has been executed. It is currently listed as suspended in the PJM queue. The point of interconnection is the Fostoria Central 138 kV substation.
Generated from interconnection queue and public data sources
State
OH
County
Hancock
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Fostoria Central 138 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- WEFOSTOR69 KV T1
- POI Substation
- Fostoria Central Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about South Branch Solar