PJM-AG1-090
95 MW hybrid in Centre, PA · In queue since August 2020 · Proposed COD August 2023
95 MW
Capacity
1
Components
Solar
5y 9m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
3 years
Schedule
34 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-08-01
PJM-AG1-090 is a proposed 95 MW hybrid solar and battery project located in Centre County, Pennsylvania. The project consists of 95 MW of solar generation. It is interconnected within the PJM Interconnection queue as of August 1, 2020, with a proposed commercial operation date of August 1, 2023. The project's interconnection status is currently in the Feasibility Study phase, and the point of interconnection is Philipsburg 115 kV.
The proposed project is located within the PENELEC utility service area.
Generated from interconnection queue and public data sources
State
PA
County
Centre
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Philipsburg 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- PHILIPSB115 KV UNSH_SP
- POI Substation
- Philipsburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-090