Project PJM-AG1-098 — Project Summary

Queue ID
PJM-AG1-098
Capacity
107 MW
Technology
Solar
Status
active
Location
Mecklenburg, VA
Region
PJM
Developer
IA Status
Feasibility Study

PJM-AG1-098

PJM-AG1-098BetaActiveSolarPJMLBNL

107 MW generation in Mecklenburg, VA · In queue since August 2020 · Proposed COD December 2024

107 MW

Capacity

1

Components

Solar

5y 9m

In Queue

Feasibility Study

IA Status

COD target: 2024

Interconnection

Total Duration

4y 4m

Schedule

17 months past proposed COD

Feasibility Study13%
Queue EntryAug 18, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-12-01

About

PJM-AG1-098 is a proposed solar generation project with a total capacity of 107 MW, located in Mecklenburg County, Virginia. The project is in the PJM interconnection queue, having entered the queue on August 18, 2020, with a proposed commercial operation date of December 1, 2024. Dominion is the interconnecting utility. The project's interconnection status is currently in the Feasibility Study phase.

The development project consists solely of solar generation, with 107 MW of solar capacity. The point of interconnection is the Briery-Clover 230 kV line. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

VA

County

Mecklenburg

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

Dominion

Entity

PJM

Service Type

Point of Interconnection

Briery-Clover 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
DOMINION HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.