Henry Solar
20 MW generation in Crawford, PA · In queue since August 2020 · Proposed COD December 2027
20 MW
Capacity
1
Components
Solar
5y 9m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
7y 4m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-12-31
The Henry Solar project is a proposed 20 MW solar generation project located in Crawford County, Pennsylvania. The project is interconnected within the PJM Interconnection queue as entry AG1-100, with a queue entry date of August 18, 2020. The proposed commercial operation date is December 31, 2027.
The interconnection agreement for the Henry Solar project has been executed. The designated point of interconnection is the Venango-Saegertown 34.5 kV grid location, within the PENELEC utility territory. The project is currently listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
PA
County
Crawford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Venango-Saegertown 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Henry Solar