Henry Solar (PJM-AG1-100) — Project Summary

Queue ID
PJM-AG1-100
Capacity
20 MW
Technology
Solar
Status
active
Location
Crawford, PA
Region
PJM
Developer
IA Status
IA Executed

Henry Solar

PJM-AG1-100BetaActiveSolarPJMLBNL + Live

20 MW generation in Crawford, PA · In queue since August 2020 · Proposed COD December 2027

20 MW

Capacity

1

Components

Solar

5y 9m

In Queue

IA Executed

IA Status

COD target: 2027

Interconnection

Total Duration

7y 4m

Construction75%
Queue EntryAug 18, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2027-12-31

About

The Henry Solar project is a proposed 20 MW solar generation project located in Crawford County, Pennsylvania. The project is interconnected within the PJM Interconnection queue as entry AG1-100, with a queue entry date of August 18, 2020. The proposed commercial operation date is December 31, 2027.

The interconnection agreement for the Henry Solar project has been executed. The designated point of interconnection is the Venango-Saegertown 34.5 kV grid location, within the PENELEC utility territory. The project is currently listed as active within the PJM queue.

Generated from interconnection queue and public data sources

Project Details

State

PA

County

Crawford

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

PENELEC

Entity

PJM

Service Type

Point of Interconnection

Venango-Saegertown 34.5 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Henry Solar