PJM-AG1-109
25 MW storage in Van Buren, MI · In queue since August 2020 · Proposed COD March 2022
25 MW
Capacity
1
Components
Battery
5y 9m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
1y 7m
Schedule
51 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-03-01
PJM-AG1-109 is a proposed 25 MW battery storage project located in Van Buren County, Michigan. The project is interconnected within the PJM Interconnection queue, having entered the queue on August 31, 2020. The proposed commercial operation date is March 1, 2022. The project's interconnection status is currently in the System Impact Study phase.
The project, which is being developed within the AEP utility territory, consists of a single 25 MW battery component.
Generated from interconnection queue and public data sources
State
MI
County
Van Buren
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Valley 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- BEAV DUQ22 KV UNIT2
- POI Substation
- Beaver Valley Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-109