PJM-AG1-118
300 MW generation in Dekalb, IL · In queue since August 2020 · Proposed COD December 2023
300 MW
Capacity
1
Components
Solar
5y 9m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
3y 4m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-29
PJM-AG1-118 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Dekalb County, Illinois, within the ComEd service area and the PJM Interconnection region. It entered the PJM queue on August 31, 2020, and has a proposed commercial operation date of December 29, 2023. The project's interconnection status is currently in the Feasibility Study phase.
The proposed project consists of 300 MW of solar photovoltaic generation. It is interconnected at the Sugar Grove-Waterman 138kV point of interconnection. The developer is not specified in the queue data.
Generated from interconnection queue and public data sources
State
IL
County
Dekalb
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Sugar Grove-Waterman 138kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.