Great Lake Growers
2.62 MW generation in Erie, PA · In queue since September 2020 · Proposed COD December 2024
2.62 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
The Great Lake Growers project is a proposed solar generation project with a total capacity of 2.62 MW. It is located in Erie County, Pennsylvania, within the PJM Interconnection region and is being developed by an unknown entity. The project consists of 2.62 MW of solar photovoltaic generation.
The project is listed in the PJM interconnection queue as entry AG1-140, with an original queue entry date of September 3, 2020. The proposed commercial operation date is December 31, 2024. Its interconnection status is currently in the System Impact Study phase, but is currently listed as suspended. The point of interconnection is at the Union City 34.5 kV substation.
Generated from interconnection queue and public data sources
State
PA
County
Erie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Union City 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Great Lake Growers