PJM-AG1-146
30 MW generation in Lancaster, VA · In queue since September 2020 · Proposed COD December 2024
30 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
4y 3m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AG1-146 is a proposed 30 MW solar generation project located in Lancaster County, Virginia. The project is in the PJM interconnection queue as of September 9, 2020, with a proposed commercial operation date of December 1, 2024. Dominion is the utility associated with the project, which is currently in the System Impact Study phase of the interconnection process.
The point of interconnection for PJM-AG1-146 is the Garner DP-Lancaster 115 kV substation. The project consists of 30 MW of solar photovoltaic generation. The project is listed as active within the PJM interconnection queue.
Generated from interconnection queue and public data sources
State
VA
County
Lancaster
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Garner DP-Lancaster 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.