PJM-AG1-154
50 MW storage in Caroline, VA · In queue since September 2020 · Proposed COD December 2023
50 MW
Capacity
1
Components
Battery
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 3m
Schedule
29 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-01
PJM-AG1-154 is a proposed 50 MW battery storage project located in Caroline County, Virginia. The project is in the PJM interconnection queue, having entered on September 10, 2020, with a proposed commercial operation date of December 1, 2023. Dominion is the interconnecting utility.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Ladysmith CT 230 kV substation.
Generated from interconnection queue and public data sources
State
VA
County
Caroline
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Ladysmith CT 230 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- LADYSMCT14 KV GT1
- POI Substation
- Ladysmith CT Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.