PJM-AG1-226
450 MW generation in Fountain, IN · In queue since September 2020 · Proposed COD June 2024
450 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
3y 9m
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-01
The proposed PJM-AG1-226 project is a 450 MW solar generation facility located in Fountain County, Indiana. The project, which is in the PJM interconnection queue, was entered on September 24, 2020, with a proposed commercial operation date of June 1, 2024. The interconnecting utility is AEP.
The project's interconnection status is currently in the Feasibility Study phase. The point of interconnection is the Eugene-Dequine 345 kV line. The development project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
IN
County
Fountain
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Eugene-Dequine 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.