Magley Solar Energy Center (PJM-AG1-232) — Project Summary

Queue ID
PJM-AG1-232
Capacity
135 MW
Technology
Solar
Status
active
Location
Adams, IN
Region
PJM
Developer
IA Status
Facility Study

Magley Solar Energy Center

PJM-AG1-232BetaActiveSolarPJMLBNL + Live

135 MW generation in Adams, IN · In queue since September 2020 · Proposed COD March 2029

135 MW

Capacity

1

Components

Solar

5y 8m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection

Total Duration

8y 6m

Facilities Study50%
Queue EntrySep 25, 2020

Interconnection request submitted to ISO/RTO

System Impact StudyCurrent

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

About

The proposed Magley Solar Energy Center is a 135 MW solar generation project located in Adams County, Indiana. The project is in the PJM interconnection queue (queue ID PJM-AG1-232), having entered the queue on September 25, 2020. The proposed commercial operation date is March 31, 2029. The interconnection status is currently in the Facility Study phase.

The project, which is being developed within the AEP utility territory, consists of 135 MW of solar photovoltaic generation. The point of interconnection is the Magley 138 kV substation. The Magley Solar Energy Center has appeared in recent news coverage regarding renewable energy development in the region.

Generated from interconnection queue and public data sources

Project Details

State

IN

County

Adams

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

AEP

Entity

PJM

Service Type

Point of Interconnection

Magley 138 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
AEP-DAYTON HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
MAGLEY 138 KV ZODIACTP

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Magley Solar Energy Center