PJM-AG1-236
180 MW generation in Logan, IL · In queue since September 2020 · Proposed COD December 2024
180 MW
Capacity
1
Components
Wind
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
4y 3m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-31
PJM-AG1-236 is a proposed wind generation project with a total capacity of 180 MW. The project is located in Logan County, Illinois, within the ComEd service territory and the PJM Interconnection region. The project entered the PJM queue on September 25, 2020, and has a proposed commercial operation date of December 31, 2024.
The project's interconnection status is currently in the Feasibility Study phase. The point of interconnection is the Lanesville-Brokaw 345 kV line.
Generated from interconnection queue and public data sources
State
IL
County
Logan
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Lanesville-Brokaw 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.