4 MW generation in Erie, PA · In queue since September 2020 · Proposed COD May 2025
4 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2025
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-05-30
Greenfield CSG 1 is a proposed 4 MW solar generation project located in Erie County, Pennsylvania. The project is being developed within the PJM Interconnection queue as project PJM-AG1-253. It entered the queue on September 25, 2020, and has a proposed commercial operation date of May 30, 2025.
The project's interconnection status is currently in the System Impact Study phase. The designated point of interconnection (POI) is the Erie East-Union City 34.5 kV line, and the interconnecting utility is PENELEC. The project's status is currently listed as suspended.
Generated from interconnection queue and public data sources
State
PA
County
Erie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Erie East-Union City 34.5 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.