BL-Hileman Hollow
20 MW generation in Blair, PA · In queue since September 2020 · Proposed COD December 2027
20 MW
Capacity
1
Components
Solar
5y 8m
In Queue
IA Executed
IA Status
COD target: 2027
Total Duration
7y 3m
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Project under construction
Typical: 12–24 months
Proposed COD: 2027-12-31
The proposed BL-Hileman Hollow project is a 20 MW solar generation project located in Blair County, Pennsylvania. The project is being developed within the PJM Interconnection region and is interconnected to the PENELEC utility grid at the Claysburg-HCR Tap 46 kV point of interconnection.
The project, identified as PJM-AG1-281 in the PJM queue, entered the queue on September 30, 2020, and has a proposed commercial operation date of December 31, 2027. The project's interconnection agreement has been executed.
Generated from interconnection queue and public data sources
State
PA
County
Blair
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
PENELEC
Entity
PJM
Service Type
—
Point of Interconnection
Claysburg-HCR Tap 46 kV
Data Source
LBNL + Live
- ISO / RTO
- PJM
- Trading Hub
- WESTERN HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.