PJM-AG1-285
125 MW generation in Charlotte, VA · In queue since September 2020 · Proposed COD December 2024
125 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
4y 3m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AG1-285 is a proposed solar generation project with a total capacity of 125 MW. The project is located in Charlotte County, Virginia, and is being developed within the Dominion service area. It entered the PJM interconnection queue on September 28, 2020, with a proposed commercial operation date of December 1, 2024. Its interconnection status is currently in the Feasibility Study phase.
The point of interconnection for PJM-AG1-285 is the Chase City-Central 115 kV line. The project consists of 125 MW of solar photovoltaic generation.
Generated from interconnection queue and public data sources
State
VA
County
Charlotte
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Chase City-Central 115 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-285