PJM-AG1-320
82 MW generation in Hardin, KY · In queue since September 2020 · Proposed COD October 2023
82 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3y 1m
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-01
PJM-AG1-320 is a proposed solar generation project with a total capacity of 82 MW, located in Hardin County, Kentucky. The project is interconnected within the PJM Interconnection queue, having entered the queue on September 30, 2020. The proposed commercial operation date is October 1, 2023. The interconnecting utility is EKPC. The project's interconnection status is currently in the System Impact Study phase.
The development project consists solely of solar generation, with the 82 MW capacity attributed to solar photovoltaic technology. The point of interconnection (POI) is the Glendale-Stephensburg 69 kV line. The project is listed as active within the PJM queue.
Generated from interconnection queue and public data sources
State
KY
County
Hardin
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Glendale-Stephensburg 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-320