PJM-AG1-323
40 MW hybrid in Logan, OH · In queue since September 2020 · Proposed COD September 2023
40 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2023
Total Duration
3 years
Schedule
33 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-01
PJM-AG1-323 is a proposed 40 MW hybrid solar and battery energy storage project located in Logan County, Ohio. The project consists of 40 MW of solar generation. It is listed in the PJM interconnection queue with an entry date of September 30, 2020, and a proposed commercial operation date of September 1, 2023. The project's interconnection status is currently in the System Impact Study phase, and the point of interconnection is the Blue Jacket 138 kV substation.
The project is in the Dayton utility service area. It is an active project in the PJM queue.
Generated from interconnection queue and public data sources
State
OH
County
Logan
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dayton
Entity
PJM
Service Type
—
Point of Interconnection
Blue Jacket 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.