PJM-AG1-326
59 MW generation in Ross, OH · In queue since September 2020 · Proposed COD December 2023
59 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
3y 3m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG1-326 is a proposed solar generation project with a total capacity of 59 MW, located in Ross County, Ohio. The project is in the PJM interconnection queue, having entered on September 30, 2020, with a proposed commercial operation date of December 31, 2023. The interconnection utility is AEP. Its interconnection status is currently in the Feasibility Study phase.
The project consists of 59 MW of solar photovoltaic generation. The point of interconnection is the Circleville-Biers Run 138 kV line. The project is listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
OH
County
Ross
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Circleville-Biers Run 138 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-326