Jade Meadow III Solar Facility (PJM-AG1-363) — Project Summary

Queue ID
PJM-AG1-363
Capacity
300 MW
Technology
Solar+Battery
Status
active
Location
Garrett, MD
Region
PJM
Developer
IA Status
IA Executed

Jade Meadow III Solar Facility

PJM-AG1-363BetaActiveSolarBatteryPJMLBNL + Live

300 MW hybrid in Garrett, MD · In queue since September 2020 · Proposed COD March 2028

300 MW

Capacity

1

Components

Solar

5y 8m

In Queue

IA Executed

IA Status

COD target: 2028

Interconnection

Total Duration

7y 6m

Construction75%
Queue EntrySep 30, 2020

Interconnection request submitted to ISO/RTO

System Impact Study

PJM processes interconnection requests through multi-phase System Impact Studies (SIS).

Typical: ~48 months (historically longest)

Interconnection Agreement

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-03-31

About

The proposed Jade Meadow III Solar Facility is a 300 MW hybrid solar and battery energy storage project located in Garrett County, Maryland. The project consists of 300 MW of solar generation capacity. It is listed in the PJM interconnection queue as project AG1-363, with a queue entry date of September 30, 2020, and a proposed commercial operation date of March 31, 2028. The interconnecting utility is APS, and the point of interconnection is the Black Oak-Hatfield 500 kV line.

The project's interconnection agreement has been executed. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

MD

County

Garrett

Grid Region

PJM Interconnection

Market

ISO/RTO Member

Developer

Utility

APS

Entity

PJM

Service Type

Point of Interconnection

Black Oak-Hatfield 500 kV

Data Source

LBNL + Live

Market Context
Approximate
ISO / RTO
PJM
Trading Hub
WESTERN HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Jade Meadow III Solar Facility