PJM-AG1-374
300 MW generation in Mclean, IL · In queue since September 2020 · Proposed COD December 2024
300 MW
Capacity
1
Components
Solar
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
4y 3m
Schedule
17 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-01
PJM-AG1-374 is a proposed solar generation project located in McLean County, Illinois. The project, with a total capacity of 300 MW, is in the PJM interconnection queue as of September 30, 2020. Its proposed commercial operation date is December 1, 2024. The interconnection request is currently in the Feasibility Study phase.
The project is interconnected to the ComEd utility area at the Blue Mound 345 kV point of interconnection.
Generated from interconnection queue and public data sources
State
IL
County
Mclean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Blue Mound 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- HIGH
- Nearest Node (Estimated)
- 989 TWIN34.5 KV HTRAILWF
- POI Substation
- Blue Mound Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.