PJM-AG1-393
20 MW generation in Dinwiddie, VA · In queue since September 2020 · Proposed COD March 2022
20 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2022
Total Duration
1y 6m
Schedule
51 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2022-03-01
PJM-AG1-393 is a proposed solar generation project located in Dinwiddie County, Virginia, within the PJM Interconnection region. The project, with a total capacity of 20 MW, consists entirely of solar photovoltaic generation. Dominion is the interconnecting utility.
The project entered the PJM interconnection queue on September 30, 2020, and has a proposed commercial operation date of March 1, 2022. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Fort Pickett DP 34.5 kV.
Generated from interconnection queue and public data sources
State
VA
County
Dinwiddie
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
Dominion
Entity
PJM
Service Type
—
Point of Interconnection
Fort Pickett DP 34.5 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- DOMINION HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-393