PJM-AG1-401
282 MW generation in Mclean, IL · In queue since September 2020 · Proposed COD September 2024
282 MW
Capacity
1
Components
Wind
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2024
Total Duration
4 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-25
The proposed PJM-AG1-401 project is a 282 MW wind generation facility located in Mclean County, Illinois. The project is interconnected within the PJM Interconnection queue, with an entry date of September 30, 2020. The proposed commercial operation date is September 25, 2024. The project's interconnection status is currently in the Feasibility Study phase.
The project is located within the ComEd utility territory and its point of interconnection is the Blue Mound-Chestnut 345 kV line. The development consists solely of wind generation, with a total capacity of 282 MW.
Generated from interconnection queue and public data sources
State
IL
County
Mclean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
ComEd
Entity
PJM
Service Type
—
Point of Interconnection
Blue Mound-Chestnut 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- N ILLINOIS HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-401