PJM-AG1-405
57 MW generation in Mclean, KY · In queue since September 2020 · Proposed COD September 2024
57 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
4 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-25
PJM-AG1-405 is a proposed solar generation project with a total capacity of 57 MW, located in McLean County, Kentucky. The project is in the PJM interconnection queue, having entered the queue on September 30, 2020. The proposed commercial operation date is September 25, 2024. The interconnecting utility is EKPC. As of the latest update, the project's interconnection status is "System Impact Study".
The project consists of 57 MW of solar photovoltaic generation. It is interconnected at the Walnut Grove-Asahi 69 kV point of interconnection. The project is currently listed as active in the PJM interconnection queue.
Generated from interconnection queue and public data sources
State
KY
County
Mclean
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
EKPC
Entity
PJM
Service Type
—
Point of Interconnection
Walnut Grove-Asahi 69 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-405