PJM-AG1-410
300 MW generation in Van Wert, OH · In queue since September 2020 · Proposed COD September 2024
300 MW
Capacity
1
Components
Solar
5y 8m
In Queue
System Impact Study
IA Status
COD target: 2024
Total Duration
4 years
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-25
PJM-AG1-410 is a proposed solar generation project with a total capacity of 300 MW. The project is located in Van Wert County, Ohio, and is being developed within the PJM Interconnection region. The project consists of 300 MW of solar photovoltaic generation.
The project entered the PJM interconnection queue on September 30, 2020, with a proposed commercial operation date of September 25, 2024. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Maddox Creek-RP Mone 345 kV line. The utility involved is AEP.
Generated from interconnection queue and public data sources
State
OH
County
Van Wert
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Maddox Creek-RP Mone 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-410