PJM-AG1-433
100 MW generation in Blackford, IN · In queue since September 2020 · Proposed COD December 2023
100 MW
Capacity
1
Components
Wind
5y 8m
In Queue
Feasibility Study
IA Status
COD target: 2023
Total Duration
3y 3m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
PJM processes interconnection requests through multi-phase System Impact Studies (SIS).
Typical: ~48 months (historically longest)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
PJM-AG1-433 is a proposed 100 MW wind generation project located in Blackford County, Indiana. The project, which consists of 100 MW of wind capacity, is in the PJM interconnection queue as of September 30, 2020, with a proposed commercial operation date of December 31, 2023. The interconnecting utility is AEP. Its interconnection status is currently in the Feasibility Study phase.
The point of interconnection for PJM-AG1-433 is the Keystone-DeSoto 345 kV line. The project is listed in the PJM queue under queue ID AG1-433.
Generated from interconnection queue and public data sources
State
IN
County
Blackford
Grid Region
PJM Interconnection
Market
ISO/RTO Member
Developer
—
Utility
AEP
Entity
PJM
Service Type
—
Point of Interconnection
Keystone-DeSoto 345 kV
Data Source
LBNL
- ISO / RTO
- PJM
- Trading Hub
- AEP-DAYTON HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project PJM-AG1-433